Tags

Feeds / SSR news

This feed is published by Silver Stream Railway.

This feed is read by this Whakaoko subscription

Added on 30 Sep 2009. Last read 1 month ago.

To subscribe to this feed, enter the following location into your feed reader.

This feed currently contains the following newsitems (total count 20):

    • Grant Received for Historic Cottage Roof
      • General A big thank you to the Rotary Club of Heretaunga Charitable Trust Inc for funds to reroof historic Waiora Cottage. The reroofing work was undertaken in December 2018 and replaces the second hand roofing iron that was fitted to the cottage not long after it arrived at Silver Stream Railway in 1980. The new colour steel material will ensure the cottage is water tight for many years to come.

    • Grant received for track maintenance
      • General Our thanks to the Wellington Community Trust for their contribution to our annual track maintenance costs. Every year we replace sleepers and upgrade the track formation to keep our trains operating safely for the enjoyment of our visitors. This contribution has allowed up to purchase new sleepers and ballast to keep our volunteers occupied for the year. 

    • Grant received for locomotive overhaul work.
      • General  We just received word of a very generous grant from The Lion Foundation towards the purchase of materials towards the return to service of PWD512 our C class saddle tank loco. While no definite timeline has been set as to when it will return to service, once efforts on the new display shed and the legacy issues with the storage shed are concluded then we hope to concentrate on some locomotive work for a nice change of scenery. read more

    • Grant Recieved for Sleepers
      • General We have just received word that the Trillian Trust has granted us sufficient money to purchase turnout sleepers to enable the first turnout to be assembled for the display shed yard track. A big thanks to them for their support.

    • Heritage Railway Vehicle Display Shed Project
      • General In January 2015 SSR embarked on a major project to construct a 650m2 display shed to enable some of our rolling stock to be displayed in a purpose built facility. Earthworks commenced in January and the foundations were laid in Febuary and over the winter months the site was tidied and the earthworks for the track approaches were completed. The shed construction got underway in October with completion of the building shell scheduled for November with the first items of rolling stock being moved in shortly after. read more

    • September Railway Update
      • General A brief rundown of what has been happening around the railway since our last update. For more up to date information and photos see our Facebook page.   read more

    • Winter Operating Days
      • Sunday Running Commencing in June, Silver Stream Railway will be beginning a new winter time table. From the 7th of June until Labour weekend the railway will be open on the 1st and 3rd Sundays of every month from 11am till 4pm. read more

    • News update May2014
      • General The 4 months that have past since the last report have been very busy, with 2 major events along with several other smaller events  and the preparation that goes into  making sure these days were a success. Our small team continues to be able to prove that our railway can still be successful, over 45 years after the idea was first mooted. The takings from these events totalled well into the 5 figure range, meaning we can continue to develop and maintain our assets for future generations to enjoy. read more

    • Royal Train Anniversary
      • Diesel Locomotives Sunday Running Events 2014 marks 60 years since the last Royal Train ran over the section of line that now makes up Silver Stream Railway. read more

    • Barclay 1749 visits Wellington Station
      • Steam Locomotives Sunday Running Events As part of the KiwiRail 150th anniversary celebrations, Barclay 1749 (PWD531) paid a visit to Wellington railway station thanks to the generous support of Hammond Crane and Cartage read more

    • Sleepers grant recieved.
      • General Track Thanks to the Hutt Mana Charitable Trust for a generous grant towards the purchase of brand new sleepers for track maintenance work at Silver Stream Railway. This grant will allow us to continue to operate a safe railway for our visitors to enjoy.

    • Community Award Recieved
      • General Silver Stream Railway Inc. was awarded the runner up certificate and prize at the Upper Hutt ceremony of the Wellington Airport Regional Community Awards 2013. Congratulations to all the other winners and runners up.

    • Historic Turntable Secured.
      • General Thanks to the support of our members and one of our Facebook likers, we have now purchased the Waitakere 50' Turntable from KiwiRail. Now the hard work starts, we need to raise the five figure sum to move it to Silver Stream and build the foundations for it to sit on. Please download a form if you would like to contribute financially to our Turntable Fund.

    • News Update April 2013
      • General The past few months has seen a huge amount of outdoor activity due to the almost uninterrupted  fine weather that the region has enjoyed. The downside of this is it has left the ground very dry and the whole region was under a fire ban for a month. This precluded the use of our steam locomotive fleet for the duration but gave our 2 De locos an opertunity for an airing. We are fortunite to be able to call on a vast stable of motive power to suit almost any requirement. This is due to the dedication of members who has nursed these locomotive back to health.  read more

    • Diesel Days.
      • Sunday Running Thanks to all our supporters who have visited over the last 4 week while we have been running our 2 diesel electric locomotives. As from Sunday 7th April we are back to running steam locomotives, but if you are a diesel fan look out for Diesel Days later in the year.   read more

Updated Feeds

Recently updated feeds from local organisations.