Trains / November 2011
December 2011 | October 2011-
-
Preparation work started in a tunnel on the NIMT
- Tranz Metro
- Work is being done at Tunnel 2 on the North Island Main Trunk now in preparation for an intensive burst of work during a two-week period at Christmas when trains will not run.
- Accepted from Tranz Metro news
- Automatically tagged as:
- trains
-
-
-
Platform changes for trains departing Wellington Station
- Tranz Metro
- From Monday 28 November 2011, more Matangi trains are being introduced into passenger service. This means some train services will be departing Wellington Station from different platforms than before.
- Accepted from Tranz Metro news
- Automatically tagged as:
- trains
-
-
-
Rimutaka Incline Railway Group proposes reinstating steam train to Manhattan’s High Line
- Wellington Region Cycleways
- If you haven’t noticed there’s been a bit of an interesting (and sometimes ugly) debate about the Rimutaka Incline Railway group who want to destroy the Rimutaka Rail Trail for cyclists and their upcoming proposal to the GWRC Cultural and Social Wellbeing Committee.
- Accepted from Wellington Region Cycleways
- Tagged as:
- rimutaka-railway
-
-
-
New look for planned disruption posters
- Tranz Metro
- We have a new improved format for planned disruption posters. They are designed to be easier to read, and are colour coded by train line.
- Accepted from Tranz Metro news
- Automatically tagged as:
- trains
-