These pictures are of 2 rocky out crops on the track, they have been ridden both ways so are deemed to be finished. As you can see by the before and after photos a lot of earth and rock has been moved to make them just right. These two sections were like big jigsaws puzzle to design, trying to fit in the nice natural rock features and make it tricky at the same time.
The track has already been started and about 100mtrs is rideable from the Vertigo end up, but as you will be able to see by the design map it is by no means finished, there are several features to be put along this part of the track, and a whole heap more along the rest of it.
The Begonia House is now fully wrapped for its major renewal, offering a rare behind the scenes look at the remarkable transformation underway as every structural element is replaced, restored, or refinished.
The Wellington Writers Walk has grown from its first eleven sculptures in 2002 to a beloved series of 23 typographical artworks celebrating poets, novelists, and playwrights connected to the capital.
With the curtain having come down on the first round Swindale Shield on a wet afternoon on Saturday, see below for some stats and numbers from the Swindale Shield and other competitions recently completed.