Engineering and Issues
-
-
Next stage underway for mass rapid transit and state highway projects
- Let's Get Wellington Moving
- Contracts for the next stage of engineering, design, and planning work on the two largest projects in Let’s Get Wellington Moving (LGWM) have gone out for tender. LGWM Programme Director Andrew Body says this is a big step forward for the $6.
- Accepted from LGWM news by feedreader
- Tagged as:
- design
- engineering
- planning
- wellington
- lets-get-wellington-moving
-
-
-
Video: Wellington's massive wind farm is switched on (29 April)
- IN-Business News: New Zealand's most advanced wind farm named "West Wind" was switched on this morning.
- Tagged as:
- makara
- wellington
- windfarm
- engineering
- video
Makara, Wellington
-