Rimutaka Incline Railway
-
-
Earthworks for workshop and track extension
- Rimutaka Incline Railway
- A 12-tonne excavator and dump truck were hard at work at Maymorn on Monday 12 January, excavating and moving spoil from the north end of our station to backfill the foundations of our workshop. The formation for our forthcoming track extension was widened and tidied up as well - with additional space cleared alongside the loop formation and a cross-drain put in. Around 50 cubic metres of good quality base course was moved into the workshop formation, as the photos below show. Over the next week or two this will be spread and compacted in preparation for the concrete floor.
- Accepted from Rimutaka Incline Railway Heritage Trust news
- Automatically tagged as:
- local-history
- rimutaka-railway
Rimutaka Incline Railway Heritage Trust, Maymorn, Upper Hutt, Upper Hutt City, Wellington, New Zealand (OpenStreetMap)
-
Tagging votes
These votes contributed to this item's tagging:
- localhistory - Publisher tag
- rimutaka-railway - Publisher tag
- trains - Ancestor of publisher tag rimutaka-railway
- transport - Ancestor of publisher tag rimutaka-railway
- Rimutaka Incline Railway Heritage Trust, Maymorn, Upper Hutt, Upper Hutt City, Wellington, New Zealand - Publisher's location