Architectural Centre Inc and Sport
-
-
Deep water
- Architectural Centre Inc
- The WCC Draft Annual Plan 2011/12 was out for public consultation recently. In these tight financial times the plan was generally about maintaining affordable rates through prioritising spending and reducing costs by $6 million, through reducing some services, improving the efficiency of other services and deferring non-urgent work. Although it’s not all cost cutting, there is an allowance to spend $650,000 on a feasibility study for a new deep-water pool in Kilbirnie.
- Submitted by tonytw1
- Tagged as:
- kilbirnie
- consultation
- wellington-city-council
- swimming
Kilbirnie, Wellington, Wellington City, Wellington, New Zealand/Aotearoa (OpenStreetMap)
-
-
-
Cake tin
- Architectural Centre Inc
- Wellington’s famous “Cake Tin”, sometimes also known by the name of the Westpac Stadium, is getting a new skin. Very quietly, and rather quickly, every single panel of external cladding is being replaced on the tin, as pictured here. Can you spot which panels are new, and which are old? [...]
- Submitted by tonytw1
- Tagged as:
- sport
-
-
-
Wind and Hills: Have Traffic Engineers Noticed?
- Architectural Centre Inc
- There’s a lot of information on the design of cycle lanes about - basic principles that most roads in Wellington contravine.
- Submitted by tonytw1
- Tagged as:
- cycling
- transport
-