T3 Track Blog / February 2007
T3 track or Technical Torture Trail will link the top of Vertigo and the top of Trickle Falls. The track will be two-way and is designed to be grade 5 techical downhill and a grade 5-6 technical uphill. The track will contain between 16 and 18 manmade and natural obstacles along the way. The track will hopefully be something that people can hone their skills on and attack with the attitude of "I'll clear it this time"
April 2007 | October 2006-
-
It's Alive.......ALIVE!!!!!
- T3 Track Blog
- At last the weather was perfect for a work party up on T3 and a dozen keen volunteers made plenty of progress on and around the Skinks Back.
- Accepted from T3 Track Blog feed by feedreader
- Automatically tagged as:
- makara
- blogs
- cycling
-
-
-
Digging holes for poles.
- T3 Track Blog
- A quick session on T3 to cement the posts in ready for the work party on The Skinks Back in the middle of October 2006. Hard work getting all the timber down to the site but thanks to Stu from the Council not as hard as it could have been. That work party was canceled due to weather and it was not until Feburary 2007 that we got back to make a start on the critter.
- Accepted from T3 Track Blog feed by feedreader
- Automatically tagged as:
- makara
- blogs
- cycling
-