Metlink
-
-
Woburn Station - Footbridge Strengthening Work
- Metlink
- From 10 August to 30 November 2020, the pedestrian footbridge at the north end of the station will be closed to allow for strengthening work to take place.
- Accepted from JVL Line alerts by tonytw1
- Automatically tagged as:
- transport
- johnsonville
Woburn, Pohutukawa Street, Woburn, Lower Hutt, Lower Hutt City, Wellington, 5010, New Zealand (OpenStreetMap)
-
Tagging votes
These votes contributed to this item's tagging:
- transport - Publisher tag
- places - Ancestor of feed tag johnsonville
- johnsonville - Feed tag
- Woburn, Pohutukawa Street, Woburn, Lower Hutt, Lower Hutt City, Wellington, 5010, New Zealand - Resources own geo tag