Matangi trains and Media
-
-
Trams or trains – what 3 studies proposed
- Wellington Scoop
- The reality of the noise problem on Johnsonville trains (which brought complaints last week) is that the heavy rail electric multiple units which provide the service are at their limits on the line, although it now has the best on-time performance of any rail line in Wellington – 94%, even with the clapped-out English Electrics that were in use till June.
- Accepted from Wellington Scoop features
- Tagged as:
- matangi-trains
- light-rail
- johnsonville
-
-
-
Matangi: milestone or mistake?
- Wellington Scoop
- Another milestone was reached in Wellington’s electric transport history on 19 March when the venerable English Electric EMUs retired from their 74-year-old career shuttling commuters up and down the 10km Johnsonville Line.
- Accepted from Wellington Scoop features
- Tagged as:
- matangi-trains
- local-history
- light-rail
- johnsonville
-
-
-
First the trains, then the buses?
- Wellington Scoop
- Stranded in Waikanae? TransMetro was replacing trains with buses between Porirua and Waikanae this weekend, because of continuing work on the Kapiti line. But today they announced that the buses may also be stopped “due to the extreme weather.”
- Accepted from Wellington Scoop features
- Tagged as:
- johnsonville
- matangi-trains
- kapiti
-
-
-
Matangi Train on new inaugural fare paying run – Footage
- HuttNZ
- Well, it arrives. The new Matangi train is not an urban myth, as footage below shows it on its first run ex Wellington 9.00am. Only two carriages, as was also expected. Didn’t get onboard, but had a sneak peak inside from the outside. Got to laugh wondered why the door didn’t open, you need to press the button, modern.
- Submitted by tonytw1
- Tagged as:
- matangi-trains
- video
-