Local History / December 2014
January 2015 | October 2014-
-
Wb 299 rebuild under way
- Rimutaka Incline Railway
- <!-- da2a.script_load(); //--> The rebuild of Baldwin steam locomotive Wb 299 is now well under way. The first major components - cab and bunker side were fabricated in time for display at RailEx. A cab seat and raised section of cab floor were added to make a more interesting exhibit, which proved quite popular with visitors.
- Accepted from Rimutaka Incline Railway Heritage Trust news
- Automatically tagged as:
- local-history
- rimutaka-railway
Rimutaka Incline Railway Heritage Trust, Maymorn, Upper Hutt, Upper Hutt City, Wellington, New Zealand (OpenStreetMap)
-
-
-
Workshop foundation wall completed
- Rimutaka Incline Railway
- <!-- da2a.
- Accepted from Rimutaka Incline Railway Heritage Trust news
- Automatically tagged as:
- local-history
- rimutaka-railway
Rimutaka Incline Railway Heritage Trust, Maymorn, Upper Hutt, Upper Hutt City, Wellington, New Zealand (OpenStreetMap)
-