Tags

Central Library closure / December 2022

The Central Library has been closed since March 2019 due to quake-resilience concerns.

March 2023 | September 2022
    • Te Matapihi – Central Library getting ready for reconstruction
      • LT McGuinness is on-site at Te Matapihi - Central Library and in full swing with enabling and strengthening works making the building ready for reconstruction. The concrete facade on Harris Street is being removed, which will be replaced by a glass curtainwall to bring in more natural light. This work also allows the piling plant and equipment to enter the ground floor early next year—the first of several major tasks to strengthen the structure—followed by new concrete foundations for the base isolators.
      • Accepted from WCC news HTTPS by feedreader
      • Tagged as:
      • central-library-closure
      • Wellington Central Library, Civic Square, Te Aro, Wellington, Wellington City, Wellington, 6011, New Zealand (OpenStreetMap)


Archive

Newsitems tagged with Central Library closure have been published during: