<?xml version="1.0" encoding="UTF-8"?>
<rss xmlns:dc="http://purl.org/dc/elements/1.1/" xmlns:georss="http://www.georss.org/georss" version="2.0">
  <channel>
    <title>Rimutaka Railway and Porirua</title>
    <link>https://wellington.gen.nz/rimutaka-railway+porirua</link>
    <description>Items tagged with Rimutaka Railway and Porirua.</description>
    <item>
      <title>Workshop build advances</title>
      <link>http://www.rimutaka-incline-railway.org.nz/news/workshop-build-advances</link>
      <description>&lt;!--
da2a.script_load();
//--&gt;

		Another milestone was reached on Friday 2 August with a third portal frame lifted into position for our workshop extension. Two portal frames arrived by truck, fresh from blasting and priming at Steam and Sand Porirua, and welding at MJH Engineering. Fabrication of the steel beams and components had earlier been completed by trust members.</description>
      <category>porirua</category>
      <category>places</category>
      <category>localhistory</category>
      <category>rimutaka-railway</category>
      <category>trains</category>
      <category>transport</category>
      <pubDate>Sun, 04 Aug 2013 00:00:00 GMT</pubDate>
      <guid>http://www.rimutaka-incline-railway.org.nz/news/workshop-build-advances</guid>
      <dc:creator>Rimutaka Incline Railway</dc:creator>
      <dc:date>2013-08-04T00:00:00Z</dc:date>
      <georss:point>-41.1087092 175.13162274900054</georss:point>
      <georss:featurename>Rimutaka Incline Railway Heritage Trust, Maymorn, Upper Hutt, Upper Hutt City, Wellington, New Zealand</georss:featurename>
    </item>
  </channel>
</rss>
