Wellington Water
-
-
Willis Street works nearing connection stage
- Wellington Water
- The first stage of the work to connect a new wastewater pipe in Willis Street, replacing the temporary overland pipe installed after the original tunnel collapse in December, is expected to be complete by the end of March.
- Accepted from Wellington Water news by feedreader
- Automatically tagged as:
- water
-
Tagging votes
These votes contributed to this item's tagging:
- water - Publisher tag